Past HVAC Projects
Hillsong Brisbane Downtown Campus - 346 George St Brisbane - Convert Tribal Theatre into church (620 occupants)
Hillsong Mt Gravatt Campus - Replace existing air conditioning system in main auditorium (1300 occupants)
3 storey Luxury residence - 95 Jefferson Lane, Palm Beach
Tri Underground Australia P/L - Warehouse and Factory - Natural Smoke Ventilation of Large Isolated Building. Neon St, Narangba
The Bardon Shed - Boutique F & V store w/ deli and cafe, Bardon
New Farm Riverwalk - New Farm. Swing bridge electrical enclosure - Heat rejection report and design improvements for Brisbane City Council.
4 storey Luxury residence - 97 Jefferson Lane, Palm Beach
Hampton Homestead - Luxury residence - Brookfield
Arethusa College - Hall A/C design
Energex Raceview - Refurbishment and extension
Wintergarden Arcade – Brisbane City – Base building upgrade (Levels 1 and 2)
Major health insurer - Store Fitout - Albert St, Brisbane City
Somerset College, Robina - Additional library and classrooms
St Anthony’s Kindergarten
Hampton Homestead - Luxury residence, Brookfield
Major airline head office, Bowen Hills - HVAC investigation
RSL Aged Care (multiple sites) - HVAC investigations and reporting.
Major bank fitout – Toowong and Surfers Paradise
128 Robertson St, Fortitude Valley-Refurbishment
BOC Gases - New Office
Energex - McLachlan St - Fortitude Valley - Minor base building upgrade
Formula Interiors, Melbourne - Fitout
Lawyer's fitout - Greenstar witness testing
Major Bank - K Mart Plaza, Toowoomba: Proposed Branch refurbishment, site audit report.
Punthill Apartments - Spring Hill: Conversion to Apartment Hotel
Coppabella Mining Camp: New Administration building
Federal Law Courts - North Quay, Brisbane: New Justice offices & support office/areas, Fitout and upgrade air conditioning
Rochedale State High School: New 2 level classroom, Performance specification
King of Kings - Fortitude valley: Restaurant extension to ground level
Major Airline - Brisbane Domestic Airport: New Lounge tenancy
Arethusa College - Burpengary: Preliminary Design.
SEQ Water-Brisbane: Due Diligence Report incl. High Level NABERS initiatives and costs.
Redland City Council-Call Centre Fitout
ANZ Paddington – Proposed tenancy - Site audit report.
Sturt St, Townsville - Due Diligence report incl. High Level NABERS initiatives and costs.
Papuan Oil Search-Green Square Close, Fortitude Valley: 2 level Tenancy fitout incl. Swirl grilles and Large comms room design.
Major drink manufacturer-London, UK: Office Fitout
BHP - Groote Eylandt: New Gymnasium
Iona College, Brisbane: New Arts Centre-Heat load
Padua College - Part 2: Refurbished classrooms and offices.
28 storey high rise apartments-35 Merivale St: Preliminary design
DOCS Parole Office - 42 Cleveland St, Stones Corner: Air conditioning report c/w upgrade options.
Major energy provider – 144 Montegue Rd, South Brisbane: Tenancy fitout
Major insurance company-Head Office Tenancy Fitout–Melbourne: Comms A/C design
Pradella “Gardens” Residential Apartments - West End: Air conditioning to 226 apartments, Multi-level carpark mech vent, Mech vent common areas, Revit coordination of all services, acoustics, ground retail, KEX.
Berwick St Music teaching facility and Bayside Baptist Church: Heat load
New townhouses - Ison St, Morningside: Produce D&C Briefing docs + basic drgs for 11 new townhouses.
Major Bank - 109 Albert St: Proposed tenancy-Site audit report
Wintergarden Arcade-Level 1: Upgrade to Warm Shell, Design mech - supervise elec/fire/hyd
Lawyers-Levels 23, 25 & 26 Central Plaza 1, Queen St - Fitout
Major Airline – Macquarie Place, Sydney-3 level tenancy fitout
Queensland Conservatorium, Griffith Uni, Southbank campus-Foyer upgrade
Pearls-New Premises - Bundall, Gold Coast
Major Bank - Junction Fair Shopping Centre, Newcastle: Proposed tenancy-Site audit report
Subaru - Kedron: Heat Load
Wintergarden Arcade - Level 1: additional works
Mt Alexander Rd, Melbourne. Transformer ventilation
Pradella - Liberte Apartments - Shafston Av, Kangaroo Point: 7 level residential (112 units) plus basement carpark. Apartment A/C + carpark mech vent + common area ventilation.
Padua College-New 5 storey “Santa Croce” building consisting of seven science laboratories, including two preparation rooms; two art rooms with an outdoor area, digital studio and storeroom; senior and junior drama rooms; a film and television room; two music rooms with sound proof practice rooms and recording studio; two teaching and learning rooms; a staff room; student amenities, a uniform shop and a delivery dock.
Plus many others